Cheetham park Dig approaching halfway

TAS_1588

Lorraine: section drawing trench two

TAS_1590

Steve in cellar corridor with doorway appearing

TAS_1591

Visit by Mike, Brian and Adam , discussing progress with Vicky and volunteers

A sunny start to the day  but cooled significantly by afternoon. However trench two kept providing pottery finds, pipe bowls etc. Steve was working down in the top of a cellar corridor and discovered a doorway in the cellar.

This entry was posted in Uncategorized. Bookmark the permalink.

Comments are closed.